Benefits of a Dedicated Stockpile.
Adding a stockpile changes how every truck, loader, and shift sequence interacts underground. The question isn't whether a stockpile helps in theory and it's whether it helps enough in your mine.
In a recent study using idoba.sim to model the impact of a dedicated stockpile in an underground hard rock operation, examining total material moved, ore tonnes delivered to surface, truck productivity, and shift transition performance across the P10/P50/P90 range.
The simulation showed how stockpile placement affects load and haul interactions, shift changeover efficiency, and overall ore delivery, giving the planning team the evidence to make the capital case before committing.
$13.8
Million USD Incremental Revenue.
47%
Increased Primary Ore Throughput.
Download The Simulation Case Study
Simulation Software Built for Underground Mining.
idoba brings 35 years of operational mining experience to software built by people who understand what happens underground. idoba.sim is owned and operated by the mine's own planning team, with no simulation expertise required and no external consultants needed to run a scenario.
Cloud-based. No Installation.
idoba.sim is cloud-based. Your team has access from day one, with no local installation and no IT infrastructure to setup before you can run your first scenario.
Built for Mine Planners.
idoba.sim was built for engineers with no simulation experience. If you can describe your fleet, your haulage network, and your planning problems, you can run a scenario.
Decisions in Hours, not Days.
When your planning team owns the software, the turnaround from question to answer is hours, not weeks waiting on an external engagement.