Plan with Confidence.
Recommend with Credibility.
idoba.sim covers the full underground operating cycle for portal-access hard rock mines, from development advance and ground support through to load and haul, across up to 14 shifts. Your planning team can model how those activities interact before the schedule goes underground. No simulation expertise required.
Test New Mine Layouts and Designs.
New headings, revised access layouts, and expanded production areas all carry assumptions about how equipment will behave in practice. idoba.sim lets you model the design against your actual fleet and mine geometry so you can identify congestion, bottlenecks, and sequencing conflicts before construction begins, not after.
Validate Capital Decisions With a Defensible Range.
Fleet purchases, development commitments, and feasibility schedules are routinely built on a single number. idoba.sim adds a defensible range alongside that number: P10, P50, and P90 outcomes modelled against your actual mine geometry and fleet. Not industry averages. Not assumptions. A risk profile you can put in front of the GM with confidence.
Stress-test Plans Before You Commit Resources.
When production pressure forces a heading change, a fleet re-allocation, or a revised 14-shift schedule, the consequences ripple through equipment interactions that a spreadsheet will not catch. idoba.sim shows you where the new bottlenecks emerge and whether the revised target is achievable before crews are committed.